ews

During the process of the engineering design of the E&M equipment the client had some changes in the scope of supply and corresponding technical specifications, which increases a lot of engineering design work. Thanks to the hard work done by the engineering team and the related suppliers the approval on the engineering work was completed step by step on the schedule in meeting the required schedule of purchasing the equipment, devices and accessories.
