HMEC’s rehabilitation includes different target as below based on particular situation of power plan:
①  Better material and higher manufacturing quality to replace the old or damaged ones.
②  Improving the original performances through replacing key components and equipment in original design conditions.
③  Replacing the original key components and equipment to meeting the changed conditions which are quite different from the original design conditions.
④  Replacing the old equipment and devices to meeting requirements of safety, reliability, modern control and so on.
⑤  comprehensive rehabilitation more than one target above.
The experienced engineer team in HMEC is able to work out a most suitable solution of any rehabilitation above through diagnosing professionally particular equipment, the subsystem and the general system of particular power plant.
  • ADD: Room A601,9th Building, Mengkeshijie CBD, No.181 of Nanzhi Rd. Nangang Dist. Harbin 150090, P. R. China 
  • Tel: +86 451 51888970
  • E-mail: info@hmec-china.com
  • Fax: +86 451 51888972
  • Http://www.hmec-china.com